Recordings of 10GHz and 3.4GHz EME Polarisation tests made by G4NNS and OK1KIR
The signal provided by AMSAT DL from Bochum transmitting on 10368.500 with linear vertical polarisation using the 20m antenna. The power level started at 800W but dropped to 700W after the system warmed up (about 5 minutes) and remained at approximately that level for the remainder of the test session.
For a quick demonstration the above files have been edited together with about 10 seconds for each 10 degree step from 0 - 90 degrees:-
10 degree steps
All files are about 200KB except the last one which is about is 2.4MB
Tests with IQ4DF 28/04/2006 as recorded at OK1KIR:-
Edited file with 10 seconds for each 10 degree step from 0 - 90 degrees:-
10 degree steps
Edited file with 10 seconds of zero offset and 10 seconds of 90 degree offset
Zero offset - 90 degree offset Recordings of 3,4GHz EME Polarisation tests made by G4NNS and OK1KIR July 2007
These files recorded at G4NNS
Edited file with 10 seconds for each 10 degree step from 0 - 90 degrees:-
10 degree steps
Edited file with 10 seconds of zero offset and 10 seconds of 90 degree offset repeated 3 times.
Zero offset - 90 degree offset
G4NNS Signals received by OK1KIR starting with 90 degree offset reducing in 10 degree steps every 10 seconds to zero offset.
Zero offset - 90 degree offset
To download...right click on link and "Save As"
The files should then be playable on sound recorder, media player or Spectran.