
Some of the work completed ready for the 2011 season in order to keep her up
to proper Vindo standards. With all the major jobs now completed, she'll remain
in impressive condition for years to come.
Framework ready for tarpaulins to create a "workshop"
Being tested by the winter weather.
Inside the "workshop"
Side supports in stanchion bases are 800mm high for side deck access
The coachroof front before...
... and with the hatch raised to show how much the original mahogany had faded
No turning back now
Getting into the swing of things
The apprentice working on the hatch garage
After the first pass...another nitromors application and a sanding to go
All varnish removed. Note original stained colour beneath dorade box
After sanding starboard side only. Original colour coming back.
The first of 8 coats of Epifanes going on. (Thinned 50% then 25% then 5% etc)
After 5 coats.
7 Coats on, windows back in and covers off.


Dorada box ready for renovation
Repaired ready for teak oil
Rudder removal. The nut and thread cleaned off and unscrewed
The steering quadrant. One of the cables to be slackened so it can be raised...
....after slackening packing gland nuts
A willing helper to hold the rudder whilst the quadrant and axle are lifted up
to clear the rudder.
The axle
The rudder heel pivot post. (Stainless).
The skeg socket with stainless insert.
And with new bearing in place
Rossco wielding the polisher. (3M mops with Imperial Compound then Wax polish)