
|
Walkers Railways’s Site |
|
Tipper Page |
|
We built a Tipper out of old bits. Two old |
|
metal shelves and metal from an old |
|
washer. |
|
For the ends we cut them from the old |
|
washer and pot rivet them in place. |
|
To beef up the ends |
|
we cut out some |
|
wood ends |
|
We turn it over |
|
to rivet the ends |
|
and bottom. |
|
We cut a hole in |
|
each end for the |
|
axle to go through |
|
the body. |
|
|
|
We put an axle holder |
|
on the chassis also |
|
at both ends |
|
The Pipe is put through |
|
the axle holder and the |
|
body. |
|
Go to Tipper Page 2 |
|
|




|
An Old Frame is cut down |
|
for the Base of the Tipper |
|
We bent the shelves and had some old |
|
1” box for the ends. We used rivets to |
|
hold it together. |
|
P 10 |






|
NEXT PAGE |