
|
Walkers Railways’s Site |
|
P 25 |
|
Hydraulic Lifting Trolley Page 2 |
|
Below. Parts laid out for drilling. The Trolley base |
|
Below. The lifting arms with shafts and in box B the turned parts. |
|
Below. For the rollers that fit into the channels we drill them out with our |
|
Myford to fit the shafts. |






|
NEXT PAGE |