Home Page

Walkers Railways’s Site

Walkers Layout

Kit Page

Turntable Page

6-1/8” Gauge

Tipper Page

Big Trojan Body

Trojan Photo Page

Driving Truck Page

1./2 Ton Crane Page

Engine Shed Page

Driving Truck
Up-Grade Page

Pit & Path Page

Hydraulic Trolley Page

Hydraulic Trolley
Update Page

Replace Siding Page

Favourite Links

Mini Tipper Page

Petrol Loco
Update Pages

Loco Page

Maxitrak

Trojan 0 - 4 - 0

Driving Truck
Up-Grade Part !

New Work Shed

Class 8 Up-Grade

Maxitrak Ruston

Pit & Path Pages

page 32

NEXT PAGE

HOME PAGE

We put 1” square wire in the bottom
of the pit. We also put a small box
in so that our pump will take out
any rain water.
BELOW.
We start to lay concrete in the base

LEFT.
We lay the Concrete all at the same
time so we have no gaps in the floor.
BELOW LEFT.
We put the cover up to stop any one
from walking onto it. (It also will stop
the DOG as well..
BELOW.
We Build a cover so that we do not
fall into the pit as well. This will stay
on when we are not using it.

We made a mix of 3 sand (sharp)
2 grit and 1 cement. + water.
Do your mix in an area that you can
work round and do not have far to
take it.