
|
Walkers Railways’s Site |
|
Pit & Path Pages |
|
page 32 |
|
We put 1” square wire in the bottom |
|
of the pit. We also put a small box |
|
in so that our pump will take out |
|
any rain water. |
|
BELOW. |
|
We start to lay concrete in the base |
|
LEFT. |
|
We lay the Concrete all at the same |
|
time so we have no gaps in the floor. |
|
BELOW LEFT. |
|
We put the cover up to stop any one |
|
from walking onto it. (It also will stop |
|
the DOG as well.. |
|
BELOW. |
|
We Build a cover so that we do not |
|
fall into the pit as well. This will stay |
|
on when we are not using it. |
|
We made a mix of 3 sand (sharp) |
|
2 grit and 1 cement. + water. |
|
Do your mix in an area that you can |
|
work round and do not have far to |
|
take it. |
|
NEXT PAGE |






