Home Page

Walkers Railways’s Site

Walkers Layout

Kit Page

Turntable Page

6-1/8” Gauge

Tipper Page

Big Trojan Body

Trojan Photo Page

Driving Truck Page

1./2 Ton Crane Page

Engine Shed Page

Driving Truck
Up-Grade Page

Pit & Path Page

Hydraulic Trolley Page

Hydraulic Trolley
Update Page

Replace Siding Page

Favourite Links

Mini Tipper Page

Petrol Loco
Update Pages

Loco Page

Maxitrak

Trojan 0 - 4 - 0

Driving Truck
Up-Grade Part !

New Work Shed

Class 8 Up-Grade

Maxitrak Ruston

PETROL LOCO UPGRADE PAGE lll

HOME PAGE

BACK

Page 40

We did not cut into the old holes on top of the box as the bearers will go back in the same place. We turned down the wheel shafts on a M7.

We put the wheels back on and welded up the side with the extend shaft
See above. We refit the wheels in the bearings and refit the beading back onto the box using the old holes.
This will keep the two sets of wheels in place.

As you can see the extend shaft from wheels is on the same side as the pulley in the middle of the box as this will be part of the 4 wheel drive

NEXT PAGE